Stonebrite Construction Group
(530) 771-6025Get My Free Estimate
Service · Bathrooms

Full Bathroom Remodels Built for Daily Life and Lasting Value

We handle every part of a full bathroom remodel — demolition, waterproofing, plumbing, electrical, tile, vanity, and finish work — with a clear written scope, daily communication, and a 5-year workmanship warranty.

Get My Free Estimate View Our Work
Primary bathroom remodel in Sacramento — skylight, freestanding tub, glass shower with black fixtures, and white oak cabinetry
I want abathroom remodel
Fast·No obligation·Replies in ~1 hour during business hoursBy submitting, you agree Stonebrite may call or text you about your project.
Licensed & Insured
5-Yr Workmanship Warranty
Family-Owned · Owner-Led
Clear Written Scope
Greater Sacramento & Bay Area
What's Included

Every part of the bathroom
— handled together.

One scope, one team, one accountable owner — so the finish details land the way you imagined them.

Shower & Tub Area

Full tile or panel walls, waterproofing membrane, valve, drain, and glass enclosure — sealed and water-tight.

Vanity & Storage

Custom or stock vanity, top, hardware, mirror, and storage planned around how you use the space.

Flooring

Tile, LVP, or stone — leveled, set, and grouted by our team. Heat mats and trim included where needed.

Paint & Drywall

Repair, patch, and paint walls, ceiling, and trim to a clean, even finish.

Electrical & Lighting

GFCI receptacles, exhaust fan, vanity and ceiling lighting, switches, and dedicated circuits.

Plumbing Fixtures

Showerhead, valve, faucet, drain, and supply lines — installed to manufacturer spec.

Tile Layout

We plan tile direction, niches, accents, and trim with you before any order is placed.

Design Support

Selection guidance for tile, fixtures, finish, and color so you avoid decision fatigue.

Final Touch

Punch list closed, deep clean, warranty packet, and a care guide for everything we installed.

How It Works

From first visit to final walkthrough.

01

Start the Conversation

Tell us about your space and goals. We'll respond within about an hour during business hours.

02

In-Home Estimate

We visit, take measurements, and discuss layout, finishes, and feasibility.

03

Clear Proposal

A written scope, timeline, and investment — line by line, no surprises.

04

Agreement & Selections

We draft and sign the project agreement, then guide your selections for tile, fixtures, lighting, and finishes.

05

Build Phase

Owner-led oversight, clean jobsite, daily project updates.

06

Final Walkthrough

A thorough review, your warranty, and a punch list closed before sign-off.

See Our Process
Marble bathroom remodel in Sacramento — navy vanity, brass fixtures, freestanding tub, and glass showerRecessed shower niche with mosaic back and stacked tile surround in a Sacramento bathroom remodelBrushed brass tub spout and valve trim on handmade-look tile in a Sacramento bathroom remodelMarble hex mosaic shower pan with square drain in a Sacramento shower remodel
Design & Materials

Design guidance, not
a guessing game.

We provide finish boards, sample pickups, and trade-day showroom support so you can choose tile, fixtures, lighting, and finishes with confidence.

  • Tile, stone, mosaic, and shower wall panel selection
  • Vanity, knobs, mirror, and lighting fixture pairing
  • Faucet, valve, drain, and shower system selection
  • Lighting plans (general, task, vanity, accent)
  • Paint, trim, and door hardware coordination
Pricing & Timeline

What affects
the cost?

Every bathroom is different. We'd rather quote the actual project than print a vague range. Share a few details and we'll come measure.

Get Estimate
01

Bathroom Size

Sq ft and ceiling height drive demo, tile, paint, and material quantities.

02

Layout Changes

Moving fixtures, opening or closing walls, and relocating drains.

03

Waterproofing System

Schluter, membrane choice, niche count, and shower size.

04

Shower Choice

Tile vs. panel, frameless vs. framed glass, curbless vs. standard.

05

Finish Tier

Standard vs. premium tile, fixture grade, and vanity material.

06

Electrical Work

Existing capacity, new circuits, fan upgrades, and lighting plan.

FAQ

Common questions about bathroom remodeling

How long does a bathroom remodel take?
Most full bathroom remodels take 7–14 business days once work begins, depending on scope, layout changes, and material lead times. We provide a specific timeline in your proposal so you know exactly what to expect week by week.
What is included in the 5-year warranty?
Our limited workmanship warranty covers waterproofing, plumbing connections, and electrical installations performed by our crew. If something we did causes a defect within the warranty period, we come back and make it right. Manufacturer warranties apply separately to fixtures, tile, and materials.
Do I need to vacate the bathroom during work?
Yes — the bathroom will be out of service during the remodel. For a single-bathroom home, we do our best to sequence work efficiently to minimize disruption, and we'll discuss a plan during the estimate visit.
How do you handle project communication?
You'll receive daily project updates covering what was done, what's happening tomorrow, and any decisions needed. You also get access to a client portal for approvals, selections, and schedule visibility.
What selections will I need to make?
Tile (floor and wall), vanity, mirror, lighting fixtures, faucet, showerhead, exhaust fan, and paint color. We guide you through each selection with a clear deadline so material lead times don't delay your project.
How do you handle project-specific requirements?
Every project starts with an in-home estimate where we assess your specific layout, plumbing, and electrical. Special requirements — like aging-in-place features, radiant heat, or custom niches — are scoped and priced in writing before any work begins.

More questions? Reach out — we're happy to help.

Next Step

Ready to start your bathroom remodel?

Tell us about your bathroom and goals. We'll schedule an in-home estimate at your convenience — no pressure, no sales pitch.

Get My Free Estimate View Our Work
We respond immediately — even after hours
Text UsCall